Marsh Creek Detention Facility Bridge Replacement

Project Information
Project No.: 0662-6R4015
Federal No.: BRLO-5928(068)
 
Project Description: The work to be done generally consists of removal of existing single span steel girder bridge (24 feet by 16 feet), construction of a cast-in-place, pre-stressed concrete slab bridge (60 feet by 17.5 feet) supported on reinforced concrete abutments on spread footings, roadway and channel excavation, imported borrow, rock slope protection, detour road, aggregate base, hot mix asphalt, temporary culvert, fencing, thrie beam barrier, signing and striping.
                                                           
General Location: Marsh Creek Detention Facility Bridge located at 12000 Marsh Creek Road, Clayton        
Supervisory District: #3         
Thomas Brothers Map Reference: 614 G-6     
Contractor: TCB Industrial, Inc.             
Resident Engineer: Shu-Jon Mao
Phone: (510) 316-7254  
Start Construction Date: July 02, 2014
Working Days: 85   
Estimated Completion Date: October 15, 2014