2014 Slurry Seal Project

Project Description

Project No.:  0672-6U2152-14       

Project Description:  The project consists of applying slurry seal treatment to streets in the Walnut
Creek area and Alhambra Valley Road in the Martinez area as shown on the plans. Work will also include surface preparation (Not including base failure repairs and crack sealing by others), tree trimming, striping removal, monument installation and adjustment and placement of thermoplastic striping and pavement markings.

General Location: Walnut Creek
Supervisory District: 2
Thomas Brothers Map Reference:  612 A7, 617 F5
Contractor: Sierra Nevada Construction, Inc.
Resident Engineer: Paul Tehaney      
Phone: (925) 595-6012
Start Construction Date: August 2, 2014
Working Days: 40
Estimated Completion Date: September 30, 2014
 
Project Links

Schedule Information:

  • Alhambra Valley Road - August 14 - August 15