Hillside Drive Sidewalk

Project Description

Project No.:  0662-6U4071             

Project Description:  The project includes construction of approximately 225 feet of curb, gutter, and sidewalk, roadway pavement conforms, four curb ramps, raised pork chop island modification, striping of a crosswalk, utility box adjustments, and installation of two drainage inlets to tie into an existing box culvert.  The sidewalk will extend 225 feet from the intersection of Castro Ranch Road to connect to the existing sidewalk along the east side of Hillside Drive.
                                                           

General Location: Hillside Drive at Castro Ranch Road in El Sobrante             
Supervisory District: # 1       
Thomas Brothers Map Reference:  Page 589/ H4       
Contract Cost (Est.): $87,000       
Project Manager: Billilee Saengchalern               
Bid Due Date: TBD
Funding Source: Road Funds          
Working Days: # TBD      
Construction Date:

Outreach Program:
The bidder shall make a “Good Faith Effort”, and document this effort, to obtain sub-bid participation by MBE’s, WBE’s, OBE’s, SBE’s and LBE’s in accordance with the project special provisions to be eligible for award.  Bidders that have not attended a pre bid meeting in the last 12 months should attend the County pre bid meeting noted in the Notice to Contractors.  The pre bid meeting will include an overview of the Outreach Program requirements and staff will be available to answer your questions.Summer 2014