Walnut Blvd Pedestrian and Bicycle Project

Project Information
Project No.:  0662-6R4176-14              
 
Project Description:  Construct a 5 foot wide pedestrian path along the northeast side of Walnut Boulevard near Walnut Heights Elementary School, from Bellows Court to Clarkin Court, and install Class III bike route signage from Bellows Court to Mountain View Boulevard. Install two speed feedback signs near Sutherland Drive and a push-button operated crosswalk beacon at McConnell Lane.
                                                                     
General Location: Walnut Creek 
Supervisory District: #4         
Contractor: Grade Tech, Inc.                 
Resident Engineer: Chad Langstraat
Phone: (916)509-1301
Start Date: July 28, 2014
Working Days: 40
Estimated Completion Date: September 28, 2014
  