Marsh Creek Road Bridge (28C0143) Scour Repair

Project Information
Project No.: 0662-6U4133-14
Project Description: The work to be done generally consists of filling and removing a temporary access road, setting up temporary ESA fence, repairing scour by installing and pressure grouting behind timber lagging, installing surface protection with rock slope protection, restoring slope by hydroseeding.

General Location: Brentwood
Supervisory District: III
Contractor: Engineered Soil Repairs, Inc.
Resident Engineer: Homira Shafaq
Phone: (925)595-6006
Estimated Start Date: August 11, 2014
Working Days: 50 
Construction Date: November 2014