San Pablo Dam Road Sidewalk Gap Project

Project Information


Project No.:  0662-6R4020            
Federal No.:  HSIPL-5928 (133)

Project Description:  The project will construct approximately 1,430 linear feet of sidewalk, driveways, driveway conforms, curb, and gutter to fill four gaps in pedestrian infrastructure on San Pablo Dam Road from Appian Way to Clark Road. Improvements also include storm drain infrastructure modifications as well as installation of historical markers to demarcate the Rancho line.
                                                                   
General Location: San Pablo Dam Road (from Appian Way to Clark Road)      
Supervisory District: District I      
Location: El Sobrante
Contractor: Kerex Engineering, Inc    
Project Engineer: Eric Sanders        
Phone: (925)595-5992
Funding Source: HSIP and Local Road Fund
Start Date: July 15, 2019
Estimated Completion Date: September 2019