San Pablo Dam Road Sidewalk Gap Project

Project Information


Project No.: 
0662-6R4020             
Federal No.:  HSIPL-5928 (133)
 
Project Description:  The project will construct approximately 1,430 linear feet of sidewalk, driveways, driveway conforms, curb, and gutter to fill four gaps in pedestrian infrastructure on San Pablo Dam Road from Appian Way to Clark Road. Improvements also include storm drain infrastructure modifications as well as installation of historical markers to demarcate the Rancho line.
                                                                     
General Location: San Pablo Dam Road (from Appian Way to Clark Road)      
Supervisory District: District I      
Location: 37.966,-122.307 
Contract Cost (Est.): $496,000     
Project Manager: Adelena Huerta        
Bid Due Date: April 30, 2019
Funding Source: HSIP and Local Road Fund
Working Days: 40
Construction Date: Summer 2019
 
DBE Program: This project is partially funded by federal funds from U.S. Department of Transportation.  The prospective bidders are required to comply with 49 Code of Regulations (CFR) Part 26.  The prospective bidders must meet the project-specific Underutilized Disadvantaged Business Enterprise (UDBE) goal or document the Good Faith Effort (GFE) process.  It is important to note that to comply with the County DBE program’s Good Faith Effort, the bidders must take certain actions a minimum of 15 days prior to bid opening.