FINAL Survey Results
Thank you for your interest
in the Voter Preference Survey for the design of the Iron Horse Trail
Pedestrian/Bicycle Overcrossing. The survey was designed to inform the County
decision makers in choosing an option. Over 550 individuals indicated
their preference. The preliminary tabulation of votes is as follows:
|
Design Option |
First Choice |
Second Choice |
Third Choice |
Fourth Choice |
Total Points* |
|
Railroad Truss |
155 |
211 |
131 |
40 |
1,555 |
|
Cable-Stay |
81 |
56 |
86 |
316 |
980 |
|
Arch |
168 |
183 |
155 |
27 |
1,557 |
|
Concrete |
149 |
77 |
142 |
135 |
1,246 |
* Four points for each first choice, 3 points for second, 2 points for third, and 1 point for fourth.
Over 35% of the voters provided comments. Staff and consultants will be analyzing the preference survey results, the comments received, along with the previous community design input to develop a report and recommendation for consideration by decision-makers.
NEXT STEPS
The Board of Supervisors selected
the Arch design for the Overcrossing at its meeting of June 10, 2003 (Staff Report**).
Construction is slated for 2005. Stay tuned to this site for periodic updates.
FURTHER
INFORMATION
Please contact the Contra Costa County
Redevelopment Agency at (925) 335-1275.
PHOTOS AND
DESIGN SUMMARY
Below are the four types of
Pedestrian Overcrossing proposed for Treat Boulevard, which are fully described
in the Summary of
Design Options**.
Click on any picture below to see enlargement.

** PDF files can only be viewed using the Adobe
Acrobat reader which is free and can be downloaded here: ![]()
LAST UPDATED: April 14, 2003